Breaking News Hot News Local News

‘Golden Gate Kalyani’ Entrance opens as we speak



President Gotabhaya Rajapaksa and Prime Minister Mahinda Rajapaksa will open the brand new Kelani Bridge (Golden Gate Kalyani), the primary high-tech cable-suspended bridge in Sri Lanka, this afternoon (24).

This bridge incorporates a cable assist system that distributes the burden of the deck between two towers. The deck is held on vertical suspender cables and the primary cables, suspended between towers, are related to the anchorages at every finish of the bridge.

This bridge was constructed with funds from the Sri Lankan Authorities and Japan Worldwide Cooperation Company (JICA).

The six-lane bridge, which goals to ease the visitors congestion in Colombo and suburban areas, is the first-ever to be constructed in Sri Lanka with hi-tech keep cables.

Mahinda Rajapaksa because the President and Minister of Highways ready the preliminary plans for 2012 and accomplished the feasibility research in 2013. In 2014, agreements had been signed for the development of the brand new Kelani Bridge utilizing Sri Lanka’s first high-tech cables.

The size of the bridge part throughout the Kelani River is 380 meters.

“Golden Gate Kalyani” was constructed beneath two phases. Underneath the primary section, Rs. 31,539 million was spent for the development of metal bridge part. The concrete suspension bridge part was constructed beneath the second section costing a sum of Rs. 9,896 million.

This was constructed beneath Japan Worldwide Cooperation Company (JICA) funding.

 





Source link

Related posts

Mahinda quits as MP

Rohan

1,512 more recoveries in Sri Lanka

Rohan

Daily depend on brand-new coronavirus instances reaches 626 

Rohan

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More

Privacy & Cookies Policy